Choosing a contract type is choosing who carries the risk
Two maintenance proposals for the same building can differ hugely in price because they are different products. One covers labour only, the other covers every part that breaks. Before comparing prices, decide which contract type fits your building, budget and risk appetite. This guide explains the main types used in Saudi Arabia for MEP maintenance.
1. Labour-only AMC (non-comprehensive)
Includes: scheduled PPM visits and call-out labour. Parts, refrigerant and subcontracted specialist work are charged separately.
Good for: new buildings with equipment still under manufacturer warranty, and owners with their own spares budget.
Watch out for: unpredictable extra invoices, and less incentive for the contractor to prevent failures.
2. Semi-comprehensive
Includes: labour plus consumables and minor parts (filters, belts, refrigerant top-up, contactors) up to a value cap per item or per year.
Good for: mid-life buildings that want a mostly fixed budget without paying a premium for major components.
Watch out for: vague definitions of “minor parts”. Get an itemised list.
3. Comprehensive
Includes: labour and all parts, including major components such as compressors, motors and pumps, with a written list of exclusions.
Good for: owners who want a fixed annual cost and want to transfer equipment risk to the contractor.
Watch out for: exclusions hidden in the fine print (for example “obsolete equipment” or “misuse”), and a contractor who does only the minimum because every repair costs them money. Insist on PPM compliance reporting.
For HVAC-specific pricing, see commercial HVAC maintenance cost in Saudi Arabia, and for chillers, our chiller AMC guide.
4. Performance-based (output) contracts
Includes: payment linked to outcomes such as system availability, response times, indoor temperature compliance and energy consumption, rather than to visits.
Good for: larger portfolios, hospitals and government facilities with good asset data.
Watch out for: it needs a reliable baseline, CMMS and BMS data, and clear measurement rules from day one.
Quick comparison
| Type | Budget certainty | Owner’s risk | Admin effort |
|---|---|---|---|
| Labour-only AMC | Low | High | High (approving every part) |
| Semi-comprehensive | Medium | Medium | Medium |
| Comprehensive | High | Low | Low |
| Performance-based | High | Low | Medium (KPI measurement) |
What every contract should contain, whatever the type
- An asset register agreed at the start (no register, no clear scope).
- A PPM schedule by asset. See our PPM schedule guide.
- Response and repair times by priority, with penalties.
- Monthly CMMS reports and quarterly review meetings.
- Clear rules for variations, emergency works and spare parts pricing.
- A handover clause: asset data and records stay with the owner.
Frequently asked questions
What is the difference between an AMC and a comprehensive maintenance contract?
A basic AMC covers labour and scheduled visits. A comprehensive contract also covers parts, including major components, for a fixed annual price.
Which contract type is best for an older building?
Usually semi-comprehensive or comprehensive, after a condition survey, so the contractor prices the real risk and you get a predictable budget.
How long should an MEP maintenance contract run?
Two to three years is common. It gives the contractor time to learn the building and invest in improvements, with KPI-based termination rights.
Get the right contract for your building
ProTech offers labour-only, comprehensive and performance-based MEP maintenance contracts across Saudi Arabia. Contact us for an asset survey and options.










