Industrial HVAC & Air Quality Solutions in Saudi Arabia
Industrial facilities require specialized HVAC, dust collection, fume extraction, and fire protection systems to maintain safe working conditions and optimize energy efficiency. Saudi ProTech, a leader in industrial MEP solutions in Saudi Arabia, provided a custom-engineered mechanical and electrical system for Juffali PolyOne Factory in Jeddah, delivering advanced environmental control, fire safety, and electrical distribution tailored to the factory’s operational needs.
The Juffali PolyOne Factory project, completed in 2013, included a chilled water HVAC system, dust filtration, fume extraction, fire suppression (FF & FA), and electrical control systems. Our approach focused on efficiency, sustainability, and cost-effectiveness, reducing power consumption while ensuring optimal air quality, cooling, and fire safety compliance.
Project Overview
Project Details
- Project Name: Juffali PolyOne Factory
- Location: Jeddah 3, Saudi Arabia
- Year: 2013
- Owner: Juffali Co.
- Project Status: Handed Over
- Scope of Work:
- HVAC System (Chilled Water Cooling for Production & Facility)
- Dust Collection & Fume Extraction
- Firefighting (FF) & Fire Alarm (FA) Systems
- Electrical & Control Systems
Project Objectives
Saudi ProTech was responsible for designing and implementing an integrated MEP system that:
- Ensures high-efficiency cooling for production and workspace areas.
- Optimizes dust and fume filtration for improved air quality.
- Reduces power consumption by integrating heat recovery into HVAC operations.
- Enhances safety measures through fire suppression and alarm systems.
- Implements a robust electrical distribution and control network for seamless factory operations.
Project Challenges
- Managing air quality with dust & fume extraction in an industrial setting.
- Combining HVAC and heat recovery for energy-efficient air treatment.
- Ensuring proper air pressure balance to optimize filtration and cooling.
- Coordinating electrical and control systems to support all mechanical operations.
Scope of Work: Advanced HVAC, Dust & Fume, Fire & Electrical Systems
1. HVAC System: Chilled Water Cooling for Production & Facility
A. System Design & Implementation
Our HVAC design included a chilled water system that efficiently managed both facility cooling and production cooling through a dual-purpose air treatment system.
- Air Treatment Process:
- Dust-laden air is filtered before passing through chilled water coils for cooling and recirculation.
- Fume extraction system processes air through heat recovery units before it is exhausted outside.
- The makeup air is then pre-cooled using the heat recovery system and sent through chilled water coils before being reintroduced into the factory.
- Benefits of Integrated Cooling:
- Energy Efficiency: Minimizes power consumption by leveraging heat recovery.
- Optimized Airflow: Eliminates redundant ductwork and excessive power distribution.
- Uniform Temperature Control: Maintains stable cooling across different facility zones.
2. Dust Collection & Fume Extraction System
A. Industrial Dust Collection System
Dust control is critical for air quality and worker safety. We installed an advanced dust filtration system that:
- Captures industrial dust and particulates from production areas.
- Sends filtered air through chilled water coils before being recirculated.
- Eliminates airborne contaminants and ensures compliance with health & safety regulations.
B. Fume Extraction & Heat Recovery System
- Extracts harmful fumes and exhaust gases from industrial processes.
- Processes air through an air-to-air heat recovery unit before expelling it outside.
- Reduces the factory’s energy footprint by pre-cooling incoming fresh air using recovered heat.
3. Firefighting (FF) & Fire Alarm (FA) System
Key Benefits of the Dust & Fume System:
– Cleaner Air: Improves indoor air quality and worker health.
– Energy Savings: Uses waste heat to improve cooling efficiency.
– Compliance with Regulations: Meets industrial air quality and environmental standards.
A. Fire Suppression System Installation
The fire protection system included:
- Automatic sprinkler systems for rapid fire containment.
- CO2 and FM-200 fire suppression systems for specialized equipment areas.
- Fire hydrants and hose reels positioned strategically for emergency response.
B. Fire Alarm & Detection System
- Smoke and heat detection sensors installed across the factory.
- Centralized fire alarm control panel for rapid response and monitoring.
- Automated emergency notifications to alert factory personnel in case of fire hazards.
Key Benefits of Fire Protection System:
– Quick Fire Suppression: Immediate response to fire threats.
– Comprehensive Safety Compliance: Meets Saudi Arabian fire safety regulations.
– Automated Detection & Alarm System: Minimizes risk through real-time monitoring.
4. Electrical & Control Systems
A. Electrical Power Distribution
Saudi ProTech provided full electrical infrastructure solutions to support all factory operations.
- Main power panels & sub-distribution boards for HVAC, dust collection, and production machinery.
- Dedicated circuits & surge protection for sensitive equipment.
- Load balancing & power efficiency to reduce electrical costs.
B. Advanced Control & Automation
- Centralized control system for monitoring HVAC, dust collection, and fire safety systems.
- Automated HVAC operations based on temperature and air quality data.
- Energy management system for optimizing power consumption.
Key Benefits of Electrical & Control System:
– Seamless Integration: All mechanical systems work under one control network.
– Reduced Energy Costs: Optimized power distribution prevents excess consumption.
– Reliable Factory Operations: Ensures continuous power supply for production needs.
Project Benefits & Operational Impact
1. Enhanced Cooling & Air Quality
- Integrated HVAC & dust collection system maintains clean, temperature-controlled air.
- Optimized airflow and pressure control eliminate unwanted air leakage.
2. Improved Energy Efficiency & Cost Savings
- Heat recovery system significantly reduces power consumption.
- Smart automation in HVAC & electrical systems optimizes energy usage.
3. Robust Fire Safety & Electrical Stability
- Comprehensive fire suppression & alarm system protects equipment and personnel.
- Reliable power distribution network ensures uninterrupted production.
Conclusion: Setting a New Standard in Industrial MEP Solutions
The Juffali PolyOne Factory project showcases Saudi ProTech’s expertise in designing and building industrial MEP solutions tailored for efficiency, safety, and sustainability. Our integrated HVAC, dust collection, fume extraction, fire suppression, and electrical systems have created a cost-effective, energy-efficient, and high-performance facility for Juffali Co. in Jeddah.
Need Expert HVAC & Industrial MEP Solutions in Saudi Arabia?
Saudi ProTech delivers turnkey industrial cooling, air quality, fire safety, and electrical solutions for factories, warehouses, and processing plants.
📞 Contact us today to discuss your project requirements and discover why we are Saudi Arabia’s trusted MEP contractor.