Petromin Gasoline Stations

Petromin Gasoline Stations

Petromin Gasoline Stations Construction & MEP Project

Advanced MEP & Construction Solutions for Fuel Stations

Gasoline stations require robust infrastructure, efficient mechanical systems, and advanced safety measures to ensure smooth operations and compliance with industry standards. Saudi ProTech, a leading construction and MEP contractor in Saudi Arabia, was entrusted with delivering civil works, air conditioning, firefighting, fire alarm, electrical, and plumbing solutions for Petromin Gasoline Stations in Jeddah (Hira & Almarwa).

Completed in 2016, this project focused on enhancing fuel station operations with modern infrastructure, safety compliance, and energy-efficient solutions. Our turnkey approach ensured that Petromin’s fuel stations met the highest quality, safety, and operational standards.

This article highlights the scope of work, technical execution, and project benefits of our construction and MEP solutions at Petromin Gasoline Stations.


Project Overview

Project Details

  • Project Name: Petromin Gasoline Stations
  • Location: Jeddah (Hira & Almarwa), Saudi Arabia
  • Year: 2016
  • Owner: Petromin
  • Project Status: Handed Over
  • Scope of Work:
    • Civil Works for AL Bashaer & Alqus Stations
    • HVAC System Design, Supply & Installation
    • Firefighting & Fire Alarm System Installation
    • Electrical & Plumbing System Installation
    • Testing & Commissioning

Project Objectives

Saudi ProTech was responsible for:

  • Developing civil infrastructure for durable and safe gas station operations.
  • Installing an efficient HVAC system for customer convenience and employee comfort.
  • Ensuring fire safety compliance through firefighting & fire alarm systems.
  • Upgrading electrical and plumbing systems for smooth daily operations.
  • Delivering a fully operational and tested facility with minimal environmental impact.

Project Challenges

  • Implementing fire safety systems in a high-risk environment with fuel storage.
  • Ensuring energy efficiency in air conditioning and electrical systems.
  • Coordinating multiple MEP installations while maintaining strict safety protocols.
  • Complying with Saudi Arabian fuel station construction regulations.

Scope of Work: Construction & MEP Implementation

1. Civil Works: Infrastructure Development for Gasoline Stations

A. Site Preparation & Structural Work

  • Conducted foundation and structural reinforcement to support fuel station operations.
  • Developed concrete flooring, canopies, and structural steel supports.
  • Installed drainage and wastewater management systems for fuel spill control.

Key Benefits:
Durable Construction: Designed for long-term fuel station operations.
Safety Compliance: Spill-resistant flooring prevents environmental hazards.
Optimized Site Layout: Efficient space utilization for fuel pumps, service areas, and convenience stores.


2. HVAC System: Air Conditioning for Gas Stations

A. HVAC Design & Engineering

  • Designed a cooling system to maintain comfortable temperatures inside the fuel station service area.
  • Conducted heat load calculations to determine optimal AC capacity.

B. HVAC Equipment Installation

  • Installed ducted split air conditioning units for uniform cooling.
  • Ensured energy-efficient operation with modern HVAC controls.

Key Benefits:
Enhanced Customer Experience: Comfortable waiting areas inside the station.
Energy Efficiency: Optimized cooling reduces power consumption.
Reliable Performance: Ensures uninterrupted operation during peak hours.


3. Firefighting & Fire Alarm System: Safety Compliance & Protection

Fuel stations require high-level fire protection systems due to the risk of flammable liquid storage.

A. Firefighting System Installation

  • Installed automatic fire suppression systems near fuel pumps.
  • Installed fire extinguishers, hose reels, and hydrants for emergency response.
  • Used fire-resistant piping and fittings for long-term durability.

B. Fire Alarm System Implementation

  • Installed smoke & heat detectors across the station and service areas.
  • Integrated alarm panels & notification systems for real-time alerts.

Key Benefits:
Enhanced Safety: Quick response systems reduce fire hazards.
Compliance with Saudi Fire Codes: Adheres to national fire safety regulations.
Automated Monitoring: Fire alarm system ensures 24/7 security.


4. Electrical System: Power Distribution & Load Management

A. Electrical Power Supply & Installation

  • Installed main power distribution panels for fuel dispensers, lighting, and cooling systems.
  • Ensured grounding and surge protection to prevent electrical faults.
  • Integrated backup power sources to ensure continuous fuel station operations.

B. Energy Optimization & Safety Measures

  • Installed LED lighting for low energy consumption.
  • Implemented automated power management for lighting and HVAC systems.

Key Benefits:
Reliable Power Supply: Prevents operational interruptions.
Energy Efficiency: Reduces electricity costs with smart load management.
Safety Compliance: Meets Saudi electrical safety codes for fuel stations.


5. Plumbing System: Water Distribution & Waste Management

A. Plumbing Supply & Installation

  • Installed water supply lines for customer service and station maintenance.
  • Developed wastewater drainage systems to handle fuel-related spills.
  • Ensured proper sewage connections for hygiene and sanitation.

Key Benefits:
Sustainable Water Management: Prevents water wastage and contamination.
Efficient Drainage System: Avoids flooding and spill accumulation.
Hygienic Operations: Maintains cleanliness in fuel station service areas.


Testing, Commissioning & Handover

Once all construction and MEP systems were installed, our team conducted comprehensive testing and commissioning to validate functionality, safety, and efficiency.

A. HVAC System Testing

  • Airflow balancing and temperature validation to ensure optimal cooling.
  • Energy consumption analysis to optimize HVAC efficiency.

B. Fire Protection & Alarm System Commissioning

  • Testing of fire suppression and alarm systems for instant response.
  • Simulation of fire safety drills for staff training.

C. Electrical & Plumbing Inspections

  • Load testing for electrical distribution panels to prevent overloads.
  • Pressure testing for plumbing pipelines to ensure leak-proof connections.

Successfully handed over a fully operational, safe, and energy-efficient fuel station to Petromin.


Key Benefits of the Petromin Gasoline Stations Project

1. Durable & Safe Fuel Station Infrastructure

  • Reinforced civil works ensure long-lasting durability.
  • Spill-resistant flooring and drainage systems prevent environmental hazards.

2. Energy-Efficient HVAC & Electrical Systems

  • Smart air conditioning systems optimize cooling performance.
  • LED lighting and automated controls reduce electricity costs.

3. Advanced Fire Protection for Fuel Stations

  • Automated fire suppression systems protect against fire hazards.
  • Integrated fire alarm & detection for real-time safety monitoring.

4. Seamless Project Execution & Compliance

  • Minimal disruption to fuel station operations during installation.
  • Strict adherence to Saudi safety regulations for fuel stations.

Conclusion: Leading MEP & Construction Solutions for Fuel Stations

The Petromin Gasoline Stations Project in Jeddah showcases Saudi ProTech’s expertise in delivering top-tier construction and MEP solutions for fuel stations and industrial facilities. By integrating modern infrastructure, advanced safety systems, and energy-efficient solutions, we provided a reliable and future-proof facility for Petromin.

Need Expert MEP & Construction Services in Saudi Arabia?

Saudi ProTech is your trusted partner for industrial construction, HVAC, firefighting, and electrical solutions.

📞 Contact us today to discuss your project needs and discover how we can enhance your facility with cutting-edge MEP technology.