Why a written PPM schedule matters

Most breakdowns in Saudi commercial buildings are predictable: dirty coils in summer, worn belts, dry drain traps, untested fire pumps. A planned preventive maintenance (PPM) schedule turns those risks into routine tasks with dates and owners. Below is a practical schedule, by system, that you can adapt to your building. It is the backbone of any operation and maintenance contract in Saudi Arabia.

HVAC

FrequencyTasks
WeeklyChiller and AHU operating logs, alarms, abnormal noise or vibration, condensate drains
MonthlyFilter check and change, belt tension, split/VRF filter cleaning, cooling tower water treatment check
QuarterlyCoil cleaning, electrical terminal checks, VFD inspection, damper operation
AnnualChiller major service, tube cleaning (water-cooled), airflow and water balancing check, duct hygiene inspection

Before summer, run a pre-season readiness check of all cooling equipment. See our chiller maintenance checklist.

Electrical

FrequencyTasks
WeeklyGenerator run test (no-load) and fuel level, UPS alarms
MonthlyEmergency lighting test, panel visual inspection, generator load test as scheduled
QuarterlyEarth leakage (RCD) testing, capacitor bank check
AnnualThermal imaging of MDBs and SMDBs, breaker testing, earthing resistance test, full emergency lighting duration test

Plumbing and water

FrequencyTasks
WeeklyBooster and transfer pumps, tank levels, visible leaks
MonthlyFloor drain trap priming, lift station pump test and alarms, water heater checks
QuarterlyGrease interceptor pumping (or more often for busy kitchens), backflow preventer check
Semi-annualWater tank cleaning and disinfection, water quality testing. See water tank cleaning.

Fire and life safety

FrequencyTasks
WeeklyFire pump room check, diesel fire pump run, valve positions
MonthlyFire alarm panel status, extinguishers, hose reels, exit routes
QuarterlyDetector and device sample testing, flow and tamper switch tests
AnnualFull fire alarm test, fire pump performance test, sprinkler inspection

Details are in our fire alarm and firefighting maintenance checklist.

Lifts, BMS and building fabric

  • Lifts: monthly service by the lift contractor, with an annual safety inspection.
  • BMS: monthly alarm review and trend checks, an annual sensor calibration, and backup of the system configuration.
  • Roof and facade: pre-rain-season roof drain cleaning, sealant and waterproofing inspection.

Making the schedule work

  1. Build an asset register with location, make, model and age for every item.
  2. Load the tasks into a CMMS so work orders are generated automatically.
  3. Track PPM compliance (target ≥ 95%) and repeat faults monthly.
  4. Review the schedule yearly. Increase frequencies where faults repeat, reduce them where assets are stable.

Frequently asked questions

What is PPM in building maintenance?

Planned preventive maintenance: scheduled inspections and servicing done before failures happen, as opposed to reactive repairs.

How often should commercial HVAC be serviced in Saudi Arabia?

Monthly checks, with quarterly coil and electrical work and an annual major service, plus extra filter changes in dusty months.

Can a contractor run our full PPM program?

Yes. Under an MEP maintenance contract the contractor builds the asset register, runs the schedule and reports KPIs monthly.

Get a PPM program for your building

ProTech builds and runs PPM programs for offices, malls, hotels, hospitals and factories across Saudi Arabia. Request an asset survey.